LSP_K2 Posted January 18, 2019 Author Share Posted January 18, 2019 Tonight was very productive. I fine tuned the cannon cover top. 109, Menelaos, LSP_Kevin and 4 others 7 Link to comment Share on other sites More sharing options...
LSP_K2 Posted January 18, 2019 Author Share Posted January 18, 2019 I also added more wires and whatnot to floor, as well as port fuselage wall (still not quite finished yet, but almost). Daniel460, D.B. Andrus, LSP_Kevin and 3 others 6 Link to comment Share on other sites More sharing options...
LSP_K2 Posted January 18, 2019 Author Share Posted January 18, 2019 "Glamor shot". Greg W, Fvdm, Gazzas and 8 others 11 Link to comment Share on other sites More sharing options...
Out2gtcha Posted January 18, 2019 Share Posted January 18, 2019 2 minutes ago, LSP_K2 said: "Glamor shot". Nice Kev! Is that a clear sidewall to the pit? Or a hole in the outside of the fuselage in that same area? Gazzas 1 Link to comment Share on other sites More sharing options...
LSP_K2 Posted January 18, 2019 Author Share Posted January 18, 2019 4 minutes ago, Out2gtcha said: Nice Kev! Is that a clear sidewall to the pit? Or a hole in the outside of the fuselage in that same area? Yep, it's clear (from the spare K-4 fuselage I used for this, link here). The clear spot is from sanding and doing some other work on the fuselage exterior at that point. Out2gtcha 1 Link to comment Share on other sites More sharing options...
Out2gtcha Posted January 18, 2019 Share Posted January 18, 2019 The detailing looks real nice in there LSP_K2 1 Link to comment Share on other sites More sharing options...
Daniel460 Posted January 18, 2019 Share Posted January 18, 2019 Excellent detail work Kevin! Dan LSP_K2 1 Link to comment Share on other sites More sharing options...
Gazzas Posted January 18, 2019 Share Posted January 18, 2019 Sweet pit detailing, Dood! Gaz LSP_K2 1 Link to comment Share on other sites More sharing options...
Fvdm Posted January 18, 2019 Share Posted January 18, 2019 That's a great cockpit. Nice detailing. LSP_K2 1 Link to comment Share on other sites More sharing options...
LSP_Ray Posted January 18, 2019 Share Posted January 18, 2019 Nice detail work, Kev! LSP_K2 1 Link to comment Share on other sites More sharing options...
Shawn M Posted January 18, 2019 Share Posted January 18, 2019 nice additions LSP_K2 1 Link to comment Share on other sites More sharing options...
LSP_K2 Posted January 18, 2019 Author Share Posted January 18, 2019 Thanks for the nice thoughts, fellas, I really appreciate that. Link to comment Share on other sites More sharing options...
D.B. Andrus Posted January 18, 2019 Share Posted January 18, 2019 Beautiful work, K2! Cheers, D.B. LSP_K2 1 Link to comment Share on other sites More sharing options...
LSP_K2 Posted January 28, 2019 Author Share Posted January 28, 2019 After a somewhat lengthy delay, the remaining six stacks (port side), are now added and include weld seams. They obviously need to be straightened a bit, but that should be pretty easy. LSP_Kevin, Menelaos and Greg W 3 Link to comment Share on other sites More sharing options...
LSP_K2 Posted January 30, 2019 Author Share Posted January 30, 2019 With the stacks now dry, I've opened them up a bit (enough, anyway), so as to look more the part. I must say that this would have been a whole lot easier to do before they were attached, so I definitely played this one wrong. Menelaos, Greg W and LSP_Kevin 3 Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now