Jump to content

Scratch building a landing ship medium in scale 1/35


rammstein

Recommended Posts

hello all,

 

not done much this week, making of the tie down bar on the flag bag. I cut of the top of some stanchions (PE by scale link)

2019-08-23%2016.04.08.jpg

2019-08-23%2016.12.38.jpg?t=1566488971

then glue onto the flag bag, I also made a vent, I completely forgot this one

2019-08-23%2016.24.37.jpg

I made 10 5 gallon jerry cans by Italeri

2019-08-23%2016.27.51.jpg

they will be placed nearby one of the vents

2019-08-23%2016.31.14.jpg

enjoy,

 

Rammstein

 

Link to comment
Share on other sites

hello all,

 

this weekend I made the 40 mm bofors gun by Italeri, aluminum barrel is underway, also up-dated one 20 mm oerlikon

2019-08-26%2015.08.00.jpg

2019-08-26%2015.08.05.jpg

 a 20 mm ammo locker, must have 4 of these

2019-08-26%2016.34.35.jpg

2019-08-26%2016.34.49.jpg

also made the pyro locker, cut some plastic 1mm thickness ( 20mm ammo locker is made the same way)

2019-08-26%2011.56.11.jpg

glue together, glue some more sheets plastic onto it in different thicknesses, on the right is the hood

2019-08-26%2015.07.45.jpg

detail the hood

2019-08-26%2015.30.27.jpg

the hood is glued onto the box, above is another hood which will come on top of the hood

2019-08-26%2016.42.39.jpg

2019-08-26%2016.42.19.jpg

2019-08-26%2016.42.06.jpg

some more detail work has to be done

enjoy,

 

Rammstein

 

Link to comment
Share on other sites

hello all,

I deleted last photo in photobucket so

2019-08-27%2011.55.09_1.jpg

todays work, making some lockers

2019-08-27%2015.03.47.jpg

glue the sheets together and detail them

2019-08-28%2011.21.08.jpg

these lockers will come beside the bridge

2019-08-28%2015.29.24.jpg?t=1566933759

on the other side of the bridge I made another vent

2019-08-28%2011.52.27.jpg

2019-08-28%2012.20.57.jpg

2019-08-28%2015.29.06.jpg

then starting to build the navigation lights

2019-08-28%2019.09.15.jpg

2019-08-28%2020.11.33.jpg

enjoy,

 

Rammstein

Link to comment
Share on other sites

  • 2 weeks later...

hello all,

 

Some work done on the 20mm oerlikon platforms,  placed the rungs2019-09-08%2015.33.19.jpg

2019-09-08%2015.33.24.jpg

detailled the shell for the anchor

2019-09-08%2015.33.12.jpg

placed the navigation lights on the bridge and placed the supports for the venturi windshield

2019-09-08%2015.33.34.jpg

2019-09-08%2015.36.36.jpg

placed some supports under the aft deck

2019-09-08%2015.36.19.jpg

some photo's of the build so far

2019-09-08%2015.54.55.jpg

2019-09-08%2015.55.21.jpg?t=1567868571

2019-09-08%2015.55.03.jpg?t=1567868843

2019-09-08%2015.55.11.jpg

enjoy,

 

Rammstein

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...