Jump to content

Revell He 111P with HPH cutaway conversion.


Kahunaminor

Recommended Posts

Welcome back,

 

I have removed all the internal moulded detail of the fuselage as per the HPH instructions.  The injector pin marks will be filled, the wing concealment fitted and putties before it is all sanded:

 

13-C40-E4-A-0140-4-F0-F-8-E2-B-97860662-

 

8-DE56507-44-CC-4-FCD-9-A9-E-2-AE0327246

 

The lower wing cutouts for the fuel cell appear to be suitable. My only concern is the inner face of the insert may extend to far inboard and impinge on the false fuselage wall I have to add to hide the wing area:

 

622-D62-CE-AB9-C-4943-8825-C7-A08171-E2-

 

22-D24-CFC-4826-4612-96-C7-4-A3482-E0-B0

 

I have sanded the inner face of the resin almost as far as I dare. I will have to dry fit the wing conceal to see how I go:

 

EA61-EE5-F-0-C09-469-D-8393-B0-C1268-D39

 

The HPH instructions require careful reading in conjunction with the kit and the Eduard instructions. The HPH ones appear to jump around a little, with some sections of Eduard PE having been fitted prior to the resin installation of the HPH set. The bomb bay area is a case in point with the PE inserts in the lower openings fitted before the resin internals. 

 

I have attempted to thin the plastic to scale in the fuel cell openings in the upper wing. The internal is okay and surely a better scale thickness, however in doing so I have butchered the round openings:

 

3-BEDEE1-E-452-B-46-A4-A0-BC-34-C8567-DE

 

F60-CA698-8443-4-C85-8-C80-EF90191-E1487

 

I shall pause to consider but I believe the fix may be removal of the entire upper panel area and replacement with styrene sheet, drilled and scribed with the resin attached to the new skin.

 

Regards,

Edited by Kahunaminor
Link to comment
Share on other sites

  • 2 weeks later...

So twelve days of procrastination and I have finally started work on the fuel filler ports. The tape template was removed from the wing and placed onto a piece of 0.50mm styrene sheet. I then pinpointed the panel corners, centre of the open fuel cell doors and other detail using a needle point scribe. The template was removed and the dots joined to make the panel outline, with details relief brought out using a 0.5mm mechanical pencil. This way, I still had the intact template if I made an error:

 

 

D11207-A8-52-A2-48-A8-A4-DA-1-F5-E1203-C

 

D8578-C48-AF26-46-B9-82-BD-B13-EBDF38-FC

 

 

I test drilled the other spare wing piece to get the right speed and drill size to chain drill the panel I needed removed with my faux Dremel. Happy with my choice,I drilled out the actual piece, removing the waste with sprue cutters:

 

 

6-E040-E63-EC52-4938-A1-C8-0597-AF0035-F

 

9035-DF31-3-AAA-4566-858-B-453-E6-EDA5-E

 

8932-DCA1-1411-4-E74-BE5-E-83-F3-E472555

 

A8820-D60-4-C8-B-4-FDD-8350-02-D3-E84571

 

 

I then carefully taped the borders of the panel and using a flat file, sand stick and a lot of patience, I remove material to the tape edge:

 

 

E2486-FD1-A84-B-4-DF9-BCFA-B91848-FE37-A

 

347328-E4-0-C0-D-4-F22-B94-A-7526-CA07-D

 

C18-D1-DEB-A395-4256-B341-F28-F2811-ECA2

 

 

Until I was left with this result:

 

 

97-C075-BB-B1-AD-498-A-A0-C0-8-CA1832684

 

 

2-FB3-F8-D1-9242-4-D12-A72-D-8-DBDC43995

 

The replacement 0.50mm panel was edged with 1.5 x 1.5 strip to provide a good anchor the the plastic around the opening. Some test fits show the work has paid off and I am close.I will impart a slight curvature in the new styrene to match the wing shape and fix the smaller rear end first, allowing it to set up before moving forward to complete installation. 

 

Regards

 

 

Edited by Kahunaminor
Link to comment
Share on other sites

Going to have a go at riveting the Heinkel. Well, the half Heinkel with a quarter wing. Practicing on the surplus parts with the RB 0.75mm rivet-r. Just following the natural panel lines as practice. Then a Flory Wash and Dullcote the bring them out. First off was bare plastic on the wing, then primer on the stab before running the rivet-r along the lines. I lack a bit of consistency in pressure so that is a learning point. Not that you need much, just consistent:

 

2A346E59-F806-450E-9DEE-AACF2763F061.jpg

 

56433738-708B-499D-B417-4F2CAEB59942.jpg

 

4796AE62-1983-475E-B947-579857010F1B.jpg

 

86043DAB-7042-4FED-84A7-2443EA60063E.jpg

 

The Eduard PE sits slightly proud of the plastic if just glued on top. I got a small set of drills to remove some material (about 1mm) in a circular pattern and the PE just drops into place and sits flush:

 

11FE7E96-C139-462D-9291-6B8415BC5DFE.jpg

 

D8BD918A-174C-4B7C-AE65-1078D0379D29.jpg

 

Rivet plans for the P are very scarce so it will be a rudimentary rivet job. I have a set that Ralph used in his build a couple of years ago to assist me, so stay tuned!

 

Regards,

 

 

Link to comment
Share on other sites

Cracking piece of work !!

 

I always shy away from riveting since I cannot help obsessing about getting it right, especially where two lines meet. Is there some kind of trick to that ? What I see of yours looks dead on...

Link to comment
Share on other sites

10 hours ago, Thomas Lund said:

Cracking piece of work !!

 

I always shy away from riveting since I cannot help obsessing about getting it right, especially where two lines meet. Is there some kind of trick to that ? What I see of yours looks dead on...

 

Many thanks,

Yes, obsessing over getting it right. I am the same, hence the practice run (or runs!). Right angle joins are one of the things that still evade me. Here I merely followed the panel lines along the entire length and trusted in dumb luck. There are many that are too close together but it is something I am going to have to chew over. Possibly placing the point in the last indentation of the first line and running at 90 degrees is the answer? I remain open to answers from the floor.

 

Regards,

Link to comment
Share on other sites

  • 2 weeks later...

Welcome back and thanks for looking in,

 

After a comment at last week’s club meet (you cut me deep Shrek), I thought I should document my minimalistic approach to progress. The fuselage upper gun position piece has been bisected and added to the fuselage:

 

76B90C97-8E98-4C69-B8A4-9570039F16C1.jpg

 

The flap section has also been assembled and test fitted to the wing:

 

D13F6056-F50E-47B6-93C1-C5F83A633DBC.jpg

 

6550F8C2-ABF3-4C6A-941F-3302EB86C1D0.jpg

 

DA9C735D-52E5-4059-9C75-CA409DEF997C.jpg

 

The engine assembly had its various cooler flaps and covers test assembled and dry fitted:

 

A7B162F9-ACBF-4DED-8583-C5BA8E10E606.jpg

 

 

C9FAE77A-5BF5-48F3-9258-68985E1080C4.jpg

 

 

38751B2D-7056-4031-9E2F-AB06EBEEDD4F.jpg

 

 

Work on the fuel cell insert continues with some card shim added to get the fit even:

 

040C6A59-FB6D-47AB-9E6E-8FE24D093630.jpg

 

 

871CB096-149A-40AE-8437-5429658FA3BF.jpg

 

 

BB0F4D0A-CCA7-453A-930D-E3B31CD20C60.jpg

 

 

It was then that I realised the wheel bay assembly would need to be installed before the fuel cells. I have followed the HPH instructions but probably should have deviated and installed the MLG bay before cementing the wing halves together. Anyway, after some considered dry fitting and a couple of hours,I came up with a sequence to install which will hopefully prove the least testing:

 

CD40CC31-6DB7-4DA8-A5EE-BC605E166CBA.jpg

 

 

8EC13109-B986-4497-B7CA-94BB4D16EF56.jpg

 

 

I also removed all the alignment peg positions on the fuselage as they are superfluous and will need tidying up as well:

 

EDB846F4-7824-4255-9DBE-810BC6787085.jpg

 

 

So forward to the end of the year!

Link to comment
Share on other sites

Just realised I forgot to include the progress (sort of) for the upper wing fuel area. The new piece was inserted into the wing and glued section at a time to conform to the wing contour. Unfortunately in drilling out the forward opening, I overlooked it so a piece of card was shaped and inserted into the hole. It will be smoothed out in the putty and sanding works:

 

B516D75F-0157-4A6B-B3A6-73095D18976B.jpg

 

35CF687A-7B69-4934-A1A3-B0C1AF3E0760.jpg

 

3133DEFD-1C11-448C-9243-D4257053B8CA.jpg

 

8FF222A2-97C6-4E4F-A9DC-F481D3F0CE80.jpg

 

The interior has had some more of the styrene ribs removed to accomodate the two fuel filler port boxes. These will be thinned in a box shape some more to get the fit level:

 

2DBDFDCA-BCB5-47C2-AC56-F4DE4EB5A3D1.jpg


The inspection ports have been drilled out to accept the PE covers and they will sit flush:

 

EDC56CBF-90E0-490C-84EC-B94FA2B0EA3E.jpg

 

1E9E117A-3014-443C-B560-1F575BDE05EA.jpg


Thanks for looking in.

Link to comment
Share on other sites

Well it’s in. The old adage about a plan not working after the first shot is true. After fiddling for two hours with my planned install, I went with the front first then the roof and rear pieces put together and shuffled into place. The sides were then put in but it cost me some details and some alignment issues. This was mainly caused by not having the forward piece at as close to 90 degrees as you can. If it is out it will throw it all out. Styrene strips and card will fix the errors with some putty. If I ever build another, I shall ignore the instructions and put the MLG in place before joining the wings:

 

7347C377-7DAF-49F8-86AB-D7008A337F54.jpg

 

C03E66DD-9731-43C8-BA7F-C20755889432.jpg

 

D855BC8B-9FBF-4D6D-81AB-0DC8F39258E0.jpg

 

EE674714-9B3E-485A-A624-33EDD514E41C.jpg

 

5F16E129-ADC2-4069-8458-A7B880FD3D72.jpg

 

1B4CB133-BA23-4C92-8B38-1FF464C619D0.jpg

 

589D8C8D-93E5-456F-8C73-C765B65896C2.jpg

 

Regards,

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...