kaia Posted March 24, 2016 Author Share Posted March 24, 2016 Hello to everybody! I am back! I changed the plans of my diorama because the idea does not suit to me any more!I start the roof which will receive other elements later as well as corrugated iron!The very fast continuation ! ShelbyGT500 and Out2gtcha 2 Link to comment Share on other sites More sharing options...
kaia Posted March 24, 2016 Author Share Posted March 24, 2016 The suite !I made another "beam" to balance the set !Added by beams crossed on 2 money together!The 4éme "beam" being finally partially destroyed there is only a high part and base !I starte to make the rivets ...only 150 to be made!On the last photo we realize that the dio is too much big thus I shortened of 06cms! Link to comment Share on other sites More sharing options...
kaia Posted March 26, 2016 Author Share Posted March 26, 2016 Hello!A little of progress on the dio (finally the structure):Thus the second structures beam is ended ( inclusive damages)Assembly to white with the horizontal beam which will be of use as basis to the window (the arrivals of light) and in more it strengthens the connection between 2 structures!Creation of the big window ( I put out myself to know how to incorporate the rodoid into the wooden structure)Cut of 84 tiles of stone floor (essential base of the dio but not bad will be cut around beams and other elements of decorations) 3cmsX3cms!Some examples of extra which will be of use to decorations Link to comment Share on other sites More sharing options...
kaia Posted March 27, 2016 Author Share Posted March 27, 2016 Thanks all ! The tiler passed: 100 de facto rivets (has really 100 it of it there) and 100 are missing it to make The box of what will be of use as decoration to the factory fills And for finity of which make fragments: The frame in plastic card stays in me (it will connect the decoration with the base but will not be regular)!And well on some tiles to be cut!. i hope you enjoy it Link to comment Share on other sites More sharing options...
kaia Posted March 31, 2016 Author Share Posted March 31, 2016 Tiles are all put and sub-slept!I begin the long work of coat of paint and patina of the ground of the factory!I finally ended my 200 rivets and they are all put! The window is when to her current Rhodoïd is cut and will come to find accommodation in the frame whereas amounts are cut and meadows to be stuck on each side by the window! The whole structure is sub-slept in black, as well as most of the fragments which will take a seat(take place) on the dio!It takes shape!Tomorrow will come the coat of Brown on the structure!Once painted and skated her will take a place on the base!I finally found the color of the drone thus he(it) is not going to delay passing there! Link to comment Share on other sites More sharing options...
kaia Posted March 31, 2016 Author Share Posted March 31, 2016 After one under coat black on my tiles, I made a positioning to white of my structure and there the drama!I have of to redo 5 tiles to reposition holes (I had a gap of 0,5mm what had for consequence a bad alignment of the roof)Thus black and first sublayer "takes place" in the Medium Grey TAM ( XF-20) and a touch of XF-53 and XF-23! Then we sand a little the surface and we tap in the sponge of the White and the Black (Prince August) more or less diluted with water One obtain at this moment the good beginning of patina!50 % of the work is made for this stage!I go now ended the paint of the various fragments and to set up them on the dio in a definitive way!At the same time I shall place the other elements (electricity meter, gas tank etc.)Once these set up elements I end the patina of the ground of the factory so that it be more coherent (tasks of fat etc.) i hope you enjoy SciFi58 1 Link to comment Share on other sites More sharing options...
andromeda673 Posted March 31, 2016 Share Posted March 31, 2016 hell yeah!!!! nice work Link to comment Share on other sites More sharing options...
kaia Posted April 1, 2016 Author Share Posted April 1, 2016 Greetings!Resumed structures with the passage in the airbrush of a mixture of XF-62 (Olive Drab) and of XF-9 ( Hull Red) in 30/70 but "irregular" version not to cover all the structure, we so obtain the "old-looking" typical beginning of nuances which the patina will finish (except that it makes less of work at the end)Not great visible on the photo but in the truth it is really nice and very convincing (self-satisfaction)The gas tank has sudden a treatment paint with salt in 3 tones; black / Grey / blueThe entire fragments are under slept and pre-skated in the airbrush.Tomorrow I place fragments on the ground and I attack the paint of the roof, I end the window, continuous skate etc..........That moves forward but I have at least 60 % to make that for the diorama Hard work SciFi58 1 Link to comment Share on other sites More sharing options...
kaia Posted April 4, 2016 Author Share Posted April 4, 2016 (edited) Hi ! Next step !I have paint the feet of the pillars of the structures in white (technique of the lacquer)I badly masked but the patina will come to hide my "errors"! I cut of the plastic card(map), daubed in black and made one "frame" for my dio, then I begin to place a part of fragments in the white glue (approximately 1/3 are put)!Every fragment will be taken back one by one at the time of the patina! I work on the roof paint of corrugated irons in black and technical base in the salt for the other tints!I also scratched lamps and began the cablings which will run along beams up to the meter!Tomorrow organized by the other fragments as well as by the structure (without the roof)I pass on the drone after that to relax and see clearly there more! Edited April 4, 2016 by kaia SciFi58 1 Link to comment Share on other sites More sharing options...
kaia Posted April 6, 2016 Author Share Posted April 6, 2016 Hello!Been not too much able to work on the dio today!Hardly 20 mns this evening thus here is!I created a kind of conduct close to my gas tank "to furnish" little without overloading too much (assembly just for see)!I positioned all of fragments (I prefer all not to put them for fear of going too far limits )!On the basis of the trolley of F-104 in 1/32 I to create a kind of ...... trolley with top wood Then I work on the roof and I reports me that I am going to have to redo some corrugated iron ...... 5/6 pieces approximately)! hope you enjoy it Link to comment Share on other sites More sharing options...
kaia Posted April 8, 2016 Author Share Posted April 8, 2016 Next step!Implementation of the roof a little complicated to stick but in the end it is good!Implementation of the last one elements on the dio as well as the vertical structure!From now on it is of the patina and it's heavy stuff in term of working time! And just for pleasure (the photo is not good) Link to comment Share on other sites More sharing options...
kaia Posted April 13, 2016 Author Share Posted April 13, 2016 Next step !Patina of the dio is entirely ended!The drone is in phase of masking / paint !There I work on the door of the factory!Size = 28.5cms of top by 19cms of wide!Thus patch of card blows up + box with extra!We cut small strips of 1mm of wide on approximately 27.5cms of top for the borders of the door ( both sides work)Then we make small strips of 1mm of wide on 18.8cms for the transverse etc. ...... until obtain an attractive motive that he is beautiful when he is finished!Next stage the high and low drilling (in the green structures) and the scratch(hook-and-loop fastener) of the systems of rotation!Then paint(painting) and patina + damages on the door! Link to comment Share on other sites More sharing options...
kaia Posted April 13, 2016 Author Share Posted April 13, 2016 Today the finish line........ And Painting ! Now I go up the systems of opening and I age the set 109, Zero77 and mywifehatesmodels 3 Link to comment Share on other sites More sharing options...
kaia Posted April 21, 2016 Author Share Posted April 21, 2016 Hi ! This is the end of the diorama ! Tomorrow the Drone ! Zero77 and mywifehatesmodels 2 Link to comment Share on other sites More sharing options...
Shawn M Posted April 22, 2016 Share Posted April 22, 2016 omg thats epic! great work Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now