Well here is my first post using Image Shack.  Let's see how it goes.

 

Last we visited the R-2800 I stated that the spark plug leads really needed to be done before proceeding with the aft row of cylinders and the intake and exhaust pipes.  And that required a whole host of things to be Rhino-designed, printed, and assembled for the front of the engine.  I show here some progress on that front. 

 

First, it is this beast that I am attempting to replicate:

 

0gnCgz.png

 

And a beast it is.  This is a R-2800-59, with its Curtiss-Electric propeller control system, a GE ignition system, and a single stage supercharger.  My F4U R-2800, FYI, was a -8, and had a Hamilton Standard prop control system, a Scintilla ignition system, and a two-stage supercharger.  This all makes the engines look quite different.

 

The Curtiss propeller control system is electrical as opposed to the Hamilton Standard system which is hydraulic.  You do not see the prop control system above, as it is not yet installed.  Soon though, you will see it adorning the reduction gearbox housing on my model engine(s). 

 

The ignition system however is there, and is characterized by those two big black turtleback magneto-distributors, and a GE-dedicated ignition manifold (with all the spark plug leads emanating from it).   The GE turtleback mags are a combination magneto and distributor all in one housing.  The Scintilla ignition system, on the other hand, has a separate dual magneto that is mounted on the engine centerline between the two distributors.  I show this system here:

 

  mwlAbe.png

 

Note the centerline tall black Scintilla magneto between the teardrop-shaped distributors.  My Corsair engine has this arrangement.  Some may not know the function of the magneto - its job is to provide high voltage electrical current from the generator to the distributors.  And the distributors each have a rotor and "points", which provide electric current to the spark plugs with the proper timing and sequencing.  Automobile engines also have distributors as almost anybody knows, although they usually have a coil instead of a magneto.  So for the GE system, the functions of the magneto and distributors are combined into single units (the turtlebacks).   

 

Here I show a pair of newly printed and prepared reduction gearbox cases, or housings as P&W calls it:

 

WS33O9.jpg

 

One is for the display engine, and one will go on the airplane.  I added some drops of blue to the gray I usually use for engines.  Also note that visible on the right unit is a stiffened square cover plate bolted onto the magneto mounting surface, ordinarily used for the centerline Scintilla magneto - which is not on this engine per the discussion above.

 

Here is a pair of ignition harnesses, or manifolds:

 

ZcOxde.jpg

 

The platforms (four per manifold) are for attaching the turtleback mags - you will see that soon.  On my past engine builds, these harnesses were exceedingly difficult to scratch build.  They are so much easier to 3D print, and they are more accurate.  😁

 

I also printed off a whole bunch of spark plug lead receptacles that will attach to the manifold (15 shown - there are many more):

 

LUtiDA.jpg

 

Each manifold will get 36 receptacles ultimately.  18 cylinders, two plugs per cylinder.  

 

And assembly begins on the front of the engine, taking steps toward spark plug lead installation, which I should be able to show you next post.  Here:

 

Pjz7jY.jpg

 

Note the silver bracket and clamp that fixes the manifold to the housing - a visible detail on the airplane (an opposite part is on the far side hidden from view).   From here, sequencing is going to be key.  I know from experience that the spark plug leads are difficult to do well, mostly due to clearance and access difficulties.  If I had 1/18 scale fingers, it would not be an issue.  So one step at a time, exercising patience.  See ya next time!  

 

Edited by JayW
Posted

Been lurking this thread....

 

and yes it is King Kong indeed imo.

all s so fine, crisp..details...dont know how to say, looks fantastic.

very very fine work indeed. 

Posted (edited)
On 10/8/2025 at 2:50 AM, Greif8 said:

I'll bet working on a 1/18 scale P&W Engine is a lot of fun.

 

Well - it is fun for sure, but it is also very stressful.  Especially now with the spark plug lead rigging.  Read on.

 

As I mentioned before, sequencing is a thing with this engine build.  And that is why you will see spark plug lead work this post, before installing the aft row cylinders as originally planned.  Not only that, but a couple days ago I had a eurika moment and realized that when I get around to installing the aft row cylinders and not the intake and exhaust pipes with them, I will not be able to fit the pipes between cylinders.  So my sequencing plan changed again.

 

So, spark plug leads.  First I needed spark plugs:

 

YwPwFh.png

 

Spark plugs that most of us are familiar with are the automobile type with a rounded metal terminal, where the lead can be simply pushed onto it, and pulled off when needed.  This R-2800 spark plug, perhaps like all aircraft spark plugs, has a threaded terminal that accomodates a threaded hex head connector at the end of the lead.  That is what I have attempted to duplicate above.

 

And attached to a cylinder head:

 

CSEMyd.jpg

 

Once the 18 front row spark plugs were installed, I could commence with the very delicate and difficult hanging of the spark plug leads.  The toughest job of the engine build:

 

b5Nguj.jpg

 

 

Leads are made from .6mm solder (.024 inch dia), and painted gold before installation.  Also of note is that the scavenge oil pump has been installed, with its drain tube leading to the rocker box sump at cylinder 10 (bottom front row).   That needed to be there before rigging the spark plug leads.  Note also that the leads going to the aft spark plugs, front row cylinders, pass through holes in the top air deflectors.

 

Once the front row spark plug leads were safely in place and CA'd down, the aft row spark plug leads were next.  Well, not really.  I had not installed the aft row cylinders!   I had planned on preparing and installing all nine of them in one swoop, but then realized, as described above, that if I did that I would not be able to fit in the intake and exhaust pipes.  Recall they have extremely tight clearances with the cylinder heads.  So it would be one cylinder at a time.  Here are three aft row cylinders after prep for installation (one at a time):

 

60e9Cb.jpg

 

Six more to go.  Each of these were to see some excitement - being combined with these newly introduced parts:

 

9I0qsU.jpg

 

An intake pipe, and exhaust pipe extender, and an oh-so-delicate aft row cylinder top air deflector, also with a penetration hole for a spark plug lead. 

 

Here you see the engine after those three aft row cylinders and their associated stuff have been installed:

 

49L3tN.jpg

 

 

My favorite picture of the post, and one that signifies a great battle won.  Three intake pipes serving six cylinders (each has a "Y" split), three exhaust pipe extenders, spark plug leads with circuitous routings to the front of the engine, six valve push rod cover tubes, and the newly installed blower section providing the mount for the intake pipes.  What you see there constitutes the most involved integration work I did in Rhino.  Many difficult designs, many booboo's, many iterations to duplicate what really is the case on a real R-2800.  Wahoo!  Now for six more.  

 

The most challenging part of the spark plug lead routing involved clamps.  I show them here circled in red on a real engine:

 

 pgwmp2.png

 

One clamp (per cylinder) fixes a spark plug lead to the curved cylinder head oil drain tube.  The other is a pair of clamps (per cylinder) bolted together, and fixes two leads to one another.  Both serve to manage the positions of the various longer leads, preventing them from flopping around.  Here are my attempts to duplicate:

 

Y7l8yM.png

 

These two items are nightmares.  Just no easy way to route solder rod through those clamps without breaking something.  Six more, for this engine.  Yikes.

 

Once I finish up this spark plug lead hanging, I will focus my attention on the front of the engine.  Here is a sneak preview of things to come:

 

 0FHEFQ.jpg

 

The 3D printed turtleback mags, and the prop shaft brush cover.  These details and more are coming soon.  Please stay tuned. 

 

 

 

 

 

 

Edited by JayW
Posted

Stunning work Jay!!!!! Those cylinders are next level indeed, but I respect you even more for having slaved through building those cylinders individually by hand out of styrene all those years ago!!!!

 

Craig

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...